|
This project
involved the disconnection and stripping out of lighting
system and associated cabling, with new lighting
installation in the main areas of the abbey including
luminaries’ dimmer racks, controls and associated wiring,
also with the installation of a new automatic addressable
fire alarm system, all of which was carried out allowing the
Abbey to function as normal
|
 |